The Global Industrial process

1

Planning phase

Brad in the Perth office was approached by Elders to discuss their new shop design and interested in any suggestions. Originally the client considered gondola shelving but later settled for Longspan shelving due to its design flexibility, strength and appearance.

2

Design & engineering process

Hand drawn floor plans of the main showroom and back storeroom were provided by the client.

They indicated the areas they wanted the shelving to be positioned.
By seeing these sketches and measurements allowed Global to determine which depths and lengths best suited the space.

3

Delivery and installation process

Global arranged delivery with a local contractor and installation was completed by the client.

What products were used and why:

Contact us today for a storage solution for you!